Commercial Battery Energy Storage Systems
Cut demand charges. Stay online.
Commercial battery energy storage systems (BESS): 125 kW / 241 kWh cabinets, 750 kW / 1,446.912 kWh containerized storage and 30–60 kW off-grid systems. Compare cabinet and container configurations for commercial projects and request a site-specific quotation.
Cabinet 125 kW / 241 kWh
Container 750 kW / 1,446.912 kWh
Off-grid 30 / 40 / 60 kW
LiFePO₄ · liquid cooling
Commercial Battery Energy Storage Systems
Energy for everyday life.
Commercial sites
Cut demand charges. Stay online.
Industrial facilities
Cabinet 125 kW / 241 kWh · Container 750 kW / 1,446.912 kWh
Off-grid operations
Off-grid 30 / 40 / 60 kW · LiFePO₄ · liquid cooling
Key specs
Scale up safely.
| Liquid-cooled cabinet | 125 kW / 241 kWh · IP54 |
|---|---|
| Containerized BESS | 750 kW / 1,446.912 kWh · IP54 |
| Off-grid AC output | 30 / 40 / 60 kW |
| Off-grid battery | 84.4 / 105.5 / 120.57 kWh LiFePO₄ |
| Off-grid voltage | Three-phase 230 / 400 Vac |
Buyer questions
Which products and capacities are available?
Commercial battery energy storage systems (BESS): 125 kW / 241 kWh cabinets, 750 kW / 1,446.912 kWh containerized storage and 30–60 kW off-grid systems. Compare cabinet and container configurations for commercial projects and request a site-specific quotation.
Should I choose a 125 kW / 241 kWh BESS cabinet or containerized storage?
The catalogue includes a 125 kW / 241 kWh liquid-cooled cabinet, a 750 kW / 1,446.912 kWh containerized BESS and 30 / 40 / 60 kW off-grid systems. Select using the site load profile, required backup duration, PV capacity, grid connection and available installation space. Provide these inputs for a project quote; do not assume all configurations support the same grid or operating modes.
How do I request pricing, MOQ and delivery terms?
Pricing is quote-based. Send the model or required power and capacity, destination country, quantity and application through the inquiry form. MOQ, lead time, warranty and customization scope must be confirmed in the written quotation.
How do I check compatibility and certifications?
Request the exact model datasheet, applicable certificates and test reports before ordering. Confirm local voltage, grid requirements, interfaces and installation conditions with your project engineer. A standard listed in the catalogue does not establish certification for every model or country.
When preparing a commercial storage project, the US Department of Energy’s BESS procurement checklist provides questions for early project planning. It was written for US federal procurement; confirm the requirements for your own project and market separately.
Get a QuoteGet a quote
Tell us what you need.
Distributors, installers and OEM partners — we reply within one business day.